Comal Clear Water Estates construction dumpster rule
Comal Clear Water Estates Policy 4 requires a dumpster on every new home site from the first day of site work until the house is finished. A full dumpster is emptied and returned, or replaced, the same day. The Architectural Control Committee may approve an exception for foundation work in some cases. Fines are $200 a day, charged to the contractor's $2,500 deposit.
At a glance
- Applies to New home construction
- Dumpster on site First day of site work, including lot prep for the foundation
- Full dumpster Emptied and returned, or replaced, the same day
- Removed After all construction is complete
- Exceptions Foundation work, in some cases, with Architectural Control Committee approval
- Fine $200 a day
- Contractor deposit $2,500
- Rule document Policy 4, Construction Dumpsters
- Project questions Architectural Control Committee, permits page
- Checked Nov 21, 2026
Policy 4 requirements
A dumpster goes on the lot the day site work begins. Site work includes lot prep for the foundation and forms.
The dumpster is emptied and returned, or replaced, the same day when trash reaches the top edge and shows from the street. The same applies when it is full enough that wind blows trash and debris out.
The dumpster stays until all construction and installation is complete.
The Architectural Control Committee may approve an exception for foundation work in some cases.
The POA board adopted Policy 4 on May 25, 2023. It backs Article IX, Section 5 of the Covenants and Restrictions, which already called for a dumpster at the start of new home construction.
Fines
| Step | Timing | Result |
|---|---|---|
| Violation letter | Day 0 | Architectural Control Committee sends it to the contractor by certified mail |
| Fix period | 72 hours | Trash picked up or dumpster emptied |
| Daily fine | After 72 hours | $200 a day from the $2,500 deposit |
| Permit revoked | 48 hours later | All work stops |
| Work continues | After the permit is revoked | Another $200 a day. Unpaid fines become a lien on the lot |
A new construction permit requires all fines paid and a new $2,500 deposit. The violation letter also lists the contractor's right to a hearing under Texas Property Code Section 209.007.
Questions about a project
Homeowners and contractors with questions about a specific project contact the Architectural Control Committee through the POA permits page. The full requirements are in Policy 4.
Sources
| Source | Checked |
|---|---|
| Comal Clear Water Estates POA, Policy 4 Regarding Construction Dumpsters | Nov 21, 2026 |
| Comal Clear Water Estates POA, permits page | Nov 21, 2026 |
| Comal Clear Water Estates POA, contacts page | Nov 21, 2026 |