San Antonio dumpster rules guide · sources checked Nov 4 and Nov 10, 2026
Riverwalkdumpsters
Roofing, concrete and dirt

Tons per cubic yard for roofing, concrete and dirt

A cubic yard of asphalt roofing weighs about 731 pounds and a cubic yard of broken concrete about 860 pounds, by EPA's conversion table. Schertz sets $62.22 per ton for roll-off disposal. At that rate, 10 cubic yards of shingles comes to about $227 in landfill charges alone.

At a glance

  • Asphalt roofing 731 pounds per cubic yard
  • Broken concrete 860 pounds per cubic yard
  • Dirt and sand 929 pounds per cubic yard
  • Disposal rate used $62.22 per ton, City of Schertz fee schedule 2026-27
  • 10 cubic yards of shingles $227.41 in disposal at that rate
  • Weight source U.S. EPA table, April 2016
  • Checked Nov 4 and Nov 10, 2026

Weight table

Material, as EPA names itPounds in 1 cubic yardPounds in 10 cubic yardsDisposal for 10 cubic yards at $62.22 per ton
Composition roofing (asphalt shingles)7317,310$227.41
Large concrete, with or without rebar8608,600$267.55
Dirt and sand9299,290$289.01
Construction and demolition debris, bulk4844,840$150.57
Clean gypsum board (drywall)4674,670$145.28
Clean dimensional lumber1691,690$52.58

Method

The pounds are EPA's factors for loose debris. The dollars are arithmetic from those factors. Pounds are divided by 2,000 to get tons, and the tons are multiplied by $62.22. That rate is the per-ton disposal line in the City of Schertz fee schedule for fiscal year 2026-27. It is the one landfill-side price near San Antonio confirmed in a city document.

Haulers elsewhere in Bexar County set their own per-ton charge. The table compares materials and does not predict a bill. Ten yards of dirt weighs more than five times as much as 10 yards of lumber. Most rentals include a set number of tons and bill each ton over that.

City limits on heavy material

San Antonio's curbside bulky pickup refuses concrete, roofing and construction debris. Its four drop-off centers turn away soil, rocks and concrete and cap construction debris at 1 cubic yard per visit. Roofing or a concrete slab goes in a roll-off as a rule. The pickup rules are in the city brush and bulky pickup page.

Loading

  • Two numbers set the bill for a heavy load. They are the tons included and the charge for each ton over.
  • Concrete or dirt can be held to a smaller container or to a fill line. The hauler sets that limit.
  • Beck Landfill takes clean construction debris. A clean single-material load gives the hauler more places to unload.
  • The 20, 30 and 40 yard containers share one footprint, about 22 feet by 8 feet. Measurements are in the sizes page.

Source note

The weight factors come from one source, EPA's April 2016 table. EPA credits a 2006 California study for most of them and Florida's environmental agency for the bulk debris weight. California's own table could not be opened on November 10, 2026.

Sources